Surveying
Surveying Section Polymer Science Building, University of Southern Mississippi
Provided construction staking for the new facility. Work included staking constructing limits, grade stakes, parking lot layout and grading, all drainage structures, and building layout.
Texas Flat Road
Need a short description if possible
130 Acre Alta Survey The Louis Berger Group
Project consisted of preparing a Boundary and Topographic survey of a 130 acre proposed development site. Work included location and platting of boundary lines, monuments, existing site features, 1 foot contours, location of wetland and flood zones, and existing utilities.
Hwy 44 Route Surveys
Need information
Stennis Space Center
4,500 Acre Survey
Temple Baptist Church Hattiesburg, MS
Project included Construction Staking for storm drainage, site grading, parking lot, building corners, building columns and other site features as required by the contractor.
Keen Power Management, Inc.
Boundary and Topographic Survey for Hinds Energy Facility