Offices in Columbia, Picayune, and Brookhaven, Mississippi
Waste / Waste Water
City of Fayette, MS
- Provide Engineering Services in conjunction with the 1997 CDBG Sewer System
- Provide Engineering Services in conjunction with the 2000 CDBG Project
Town of Bassfield, MS
- Preliminary study, design, and construction / administration of a sewer lift station and force main, 2000.
- Provided Engineering Services in Connection with sanitary sewer expansion near Jackson’s Grocery, CDBG sewer rehabilitation / expansion, 2000.
- Engineering Services In Connection With: 1999 CDBG Emergency Project (water well)
City of Ellisville, MS
- 2002 CDBG and WPCRLF Sanitary Sewer Improvements Project. Project included preliminary planning, design, and construction administration for the replacement of approximately 3.4 miles of gravity sewer mains, manholes and pump stations.
Town of New Hebron, MS
- Engineering Services In Connection With: 2002 CDBG Project, Preliminary study, design, and construction administration of new water well and treatment plant improvements.
Town of Prentiss, MS
- Engineering Services In Connection With: 1996 CDBG Project: 1500 g.p.m. Water Treatment Plant, Public Facilities.
- Engineering Services In Connection With: 1998 CDBG Project: New 800 g.p.m. water well and 1200 g.p.m. pump station, elevated water storage tank rehabilitation, Public Facilities.
- Engineering Services in Connection With the 2000 CDBG Wastewater Treatment Facility Renovation
- Engineering Services In Connection With: water line relocation due to Highway 84, 2001.
- Engineering Services in Connection With the 2002 CDBG Wastewater Collection System Improvements. The project included utilization of video inspection and trench less technology repairs
Town of Silver Creek, MS
- 2000 CDBG Project, Preliminary study, design, and construction administration of a new water well.
- Engineering Services In Connection With: water main relocation due to US Highway 84 4-lane project, 2001.
Town of Tylertown, MS
- Engineering Services In Connection With: 500,000 gallon and 150,000 gallon elevated water tank rehabilitation.
- 1998 CDBG water/sewer expansion project.
- Engineering Services In Connection With: Water and sewer expansion project, 2002.
Walthall County, MS
- Provide Engineering Services in conjunction with the Salem Schools Sewer (CDBG) Project, 1999.
Bunker Hill Water Association
- Engineering Services In Connection With: Preliminary planning, design, and construction administration of new water well, new 100,000 gallon elevated water storage tank and treatment plant renovations.
City of Columbia, MS
- 1995 Preliminary study and final design for the City of Columbia Three Year Capital Improvements Program, Water and Sewer Expansion, Phases I and II.
- Preliminary study, final design, and construction administration for a 500 GPM sanitary sewer lift station located at the North Lagoon, 1996.
City of Picayune, MS
- Provided Engineering Services in Conjunction With: existing pump station rehabilitation, 2000.
Chevron Aviation Maintenance Facility, EDA Project No. 04-01-04862
- Provided preliminary planning, cost estimation, design, construction administration and resident inspection for infrastructure improvements necessary for the new aviation maintenance facility at the Picayune MS Municipal Airport. These infrastructure improvements included water distribution, fire protection, natural gas, sanitary sewer, and site improvements.
Double Ponds Water Association
- Preliminary study, engineering report, and recommendations for system improvements with the rehabilitation of a 150,000 gallon elevated water storage tank, and
- Engineering Services In Connection With: water main relocations due to realignment of US Hwy 84.
Magee’s Creek Water Association
- Engineering Services In Connection With: Water system improvements including two new water wells, water storage tank rehabilitation (6), and a new booster station, 2002.
Hwy. 98 East Water Association
- Engineering Services In Connection With: Elevated Water Tank Rehabilitation, 1999.
- Engineering Services In Connection With: New well & water distribution system improvements, 2000.
Jayess-Topeka-Tilton Water Association
- Preliminary study, design, and construction administration of new water treatment plant, 2000.
Lily Rose Water Association
- Preliminary study in response to a court order requiring improvements to the water system.
- Engineering Services In Connection With: Water main relocations due to the Highway 98 4-Lane, 1999.
West Marion Water Association
- Engineering Services In Connection With: Water main relocations due to the Highway 98 4-Lane, 1999.